Home renovation: what to do first

A renovation goes wrong when the work happens in the wrong order: tiles laid before the plumbing is tested, paint finished before the carpenter arrives. This is the order that avoids doing anything twice.

Send an enquiry Call +91 99500 38059

A guide by Terra & Tones, updated

Living to kitchen, Smoke & Copper. The media wall, the island and the tall kitchen run in one long view.
Living to kitchen, Smoke & Copper

The order of work

  1. Survey and design Measure the home and check for damp, old wiring and leaking pipes. Then fix the layout, the drawings and the budget before anyone lifts a hammer.
  2. Permissions In a flat, agree the working hours, the lift and the debris with the society. For any change to a wall, ask a structural engineer first.
  3. Breaking and masonry Remove what is going, build the new walls and ledges, and close the chases with plaster.
  4. Plumbing and waterproofing Relay the pipes, waterproof the bathrooms and the balcony, and test for leaks before any tile goes down.
  5. Electrical and AC Run the new conduits, points and AC piping while the walls are open.
  6. Flooring and tiling Lay the floors and the wall tiles, then cover them until the end.
  7. False ceiling Frame and board the ceiling, with the light and fan points in place.
  8. Carpentry Fit the kitchen, the wardrobes and the panelling.
  9. Paint and fittings Putty and primer go on early; the final coats follow the carpentry. Then lights, fans, curtains and a deep clean.

Fix these before the interiors

Three things hide behind new interiors and ruin them later: damp, old wiring and tired plumbing. Stop seepage at its source and let the wall dry. Rewire a home whose wiring is decades old or was never sized for air conditioners and an induction hob. Replace corroded pipes while the bathroom is open.

Stay or move out

A kitchen or a single bathroom can be done while you live in the home. A full renovation is faster and cleaner in an empty one. The dust from breaking and sanding reaches every room, and work in an occupied home has to run around your day.

Budgeting a renovation

Bathrooms and the kitchen cost the most for their size, because they combine plumbing, tiling, stone and fittings. Spend first on what you cannot see or change later: waterproofing, wiring and pipes. Keep about a tenth of the budget aside, because an old home always holds a surprise behind the plaster.

What we take on

Terra & Tones designs a renovation and runs the interior work: the ceilings, the electrical and lighting, the flooring, the joinery, the painting and the fitting. Changes to the structure start with a structural engineer.

Questions

What should be done first in a house renovation?

The survey and the design. Then the hidden work in order: breaking, plumbing and waterproofing, electrical. The finishes come last.

Can I live in the house during the renovation?

For one room, yes. For the whole home it is hard: there is dust, noise and no kitchen for a while. Moving out usually shortens the job.

Can new tiles go over the old ones?

Yes, if the old tiles are sound, level and firmly stuck. It saves the breaking, but it raises the floor, so check the door clearances and the bathroom thresholds first.